Rm-materials-handling WIRE ROPE HOISTS Service Manual de usuario Pagina 111

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 130
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 110
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
111/130
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
! Tighten the nuts (2)/(6) and (3) to the correct tightening torque. Refer to the section
'Recommended tightening torques'.
B
A
c_nab2b
0,1-0,2 mm
0,1-0,2 mm
6.5.2 Curved beam, when two trolleys
c_nab3a
2. Adjusting nuts for flange width
3. Trolley positioning nuts
4. Frame tube
5. Trolley side plate
Remove the temporary transport supports. Take the hoist out of the packing and move it to the
installation site. Lift the hoist using the lifting lugs provided.
Loosen the tightening nuts for flange width (2). Adjust the distance between the travel wheels (A) so
that it is slightly wider than the beam flange (B) for installation purposes by turning the screws (3). If
necessary, open also the screws (4).
Lift the hoist onto the beam.