Rm-materials-handling WIRE ROPE HOISTS Service Manual de usuario Pagina 116

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 130
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 115
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
116/130
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
6.6.2.1 Standard reeving (1 rope from drum)
Falling
ropes
L1 L2
(mm.) Inch (mm.) Inch
2 0 0 97 3,82
4 18 0,71 146 5,75
6 40 1,57 146 5,75
6.6.2.2 Standard reeving (2 ropes from drum)
Falling
ropes
L1 L2
(mm.) Inch (mm.) Inch
2 21 0,82 97 3,82
4 0 0 146 5,75
6 6 0,23 146 5,75
8 12 0,47 146 5,75
6.6.3 Outfitting the hoist
Install the power supply. Refer to the section “Connecting the to mains network”.
Adjust the limit switch for hoisting. Refer to the section “Adjusting hoisting limit switch”.
Carry out the commissioning inspection and complete the commissioning log. Refer to the section
“Commissioning”.
6.7 Installing the hoist, fixed trolley
c_fab1a
Remove the temporary transport supports. Take the hoist out of the packing and move it to the
installation site.
Check that the fixing holes in the site of location match the fixing holes (1) in the trolley.
Lift the trolley into position. Fasten the fixing screws.
Vista de pagina 115
1 2 ... 111 112 113 114 115 116 117 118 119 120 121 ... 129 130

Comentarios a estos manuales

Sin comentarios