Rm-materials-handling WIRE ROPE HOISTS Service Manual de usuario Pagina 79

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 130
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 78
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
79/130
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
Re-assembly:
Insert the rope into the rope anchorage
! Make sure the rope enters the anchorage in the correct direction. See section: “Rope
Anchorage, Service” for details
Insert the wedge into the rope anchorage, making sure that a length of at least six times the rope
diameter protrudes from the anchorage.
Pull the rope firmly into the rope anchorage, so that the shaft easily fits into the suspension hole.
Place the rope anchorage into the overload device and insert the shaft with the washers.
! It is important that the rope anchorage is correctly mounted in the overload device. See the
below table for details:
Drum φ 243
Drum φ 303 and φ 355
Drum φ 406
Drum φ 406
Drum φ 608
Drum φ 608
Drum φ 608
Assemble the rope clamps on the protruding end of the rope and insert the split-pin. Bend the split-pin
open.
# Insert NEW cotter pin, DO NOT reuse a removed cotter pin.
Vista de pagina 78
1 2 ... 74 75 76 77 78 79 80 81 82 83 84 ... 129 130

Comentarios a estos manuales

Sin comentarios