Rm-materials-handling WIRE ROPE HOISTS Service Manual de usuario Pagina 98

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 130
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 97
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
98/130
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
5.30.3 Assembly
Disassembly:
Adjust (or by-pass) the lower limit switch so that the rope can be fully unwound from the drum
Lower the hook onto a stable working-platform.
Remove the rope guide, see section “Rope guide, Assembly” for details.
Pull, with a gloved hand, the rope down from the drum, until the last turn.
Switch OFF the power supply to the crane.
Extract the rope anchorage from the overload device, see section “Rope anchorage, Assembly” for
details and remove the rope from the anchorage.
Pull the rope out from the hook block and return sheaves.
Remove the rope clamps from the drum and remove the rope.
# In some cases, it can be possible to pull the new rope on to the hoist by using the old rope and a
cable-sock. Pay special care when using this practice. Make sure there is no risk for personal
injuries and assure the new rope does not get damaged.
Re-assembly:
Check that the new rope is compatible with the hoist. Check the rope certificate to determine whether
the rope is of the correct diameter and breaking load.
Unroll the cable (when delivered as a roll) or use a cable-reel stand (when delivered on a drum).
Follow the principles as set out in standard ISO 4309.
Fasten the rope end to the rope drum with the rope clamps.
c_rorefi1a
Switch ON the power supply to the crane.
Run the rope onto the rope drum until enough free rope is available for the reeving, using the hoisting
motor.
Thread the rope through the rope sheave or rope sheaves as shown in the rope reeving diagram.
Fix the rope in the rope anchorage, tighten it and fasten the rope clamp on the free end of the rope.
! Place the rope in the rope anchorage the right way around.
Place the rope anchorage in its suspension point. Fix the locking pins.
Always adjust and check the limit switch for hoisting after replacing the rope. See section “Hoisting
limit switch, Adjustment” for details.
Vista de pagina 97
1 2 ... 93 94 95 96 97 98 99 100 101 102 103 ... 129 130

Comentarios a estos manuales

Sin comentarios