Rm-materials-handling WIRE ROPE HOISTS Service Manual de usuario Pagina 89

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 130
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 88
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
89/130
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
Remove the hook-block fixing parts (13).
Remove the side plates (11).
Remove the sheave cover screws and remove the sheave cover plate (9).
Remove the cover plate (7), locking set (8) and thrust bearing (5).
Extract the hook (3) from the bearing set (4).
Re-assembly:
Lubricate the thrust bearing and the hook shaft.
Insert the hook (3) into the bearing house (4) and re-assemble the thrust bearing (5) and the locking
set (6).
1
2
1
2
c_hobeas1a
Re-assemble the rope sheave (10), sheave cover plates (9) and the shaft (8).
Insert the hook-assembly and the sheave-assembly into the side plates (11).
Tighten the hook block fixing bolts and nuts (13) and the shaft assemble (8).
Switch ON the power supply to the crane.
Raise the hook block. Carefully guide the rope with a gloved hand until the hook block hangs free
from the working platform.
If the lower limit switch has been adjusted, re-adjust to the correct position.
Test the operation of the hoist.
Hook block 4-fall, 1-rope reeving, drum size φ 303/355/406 mm
c_hb04as1b_005211
Note: The actual hook block outlook may vary slightly, depending on the manufacturing date!
2. Safety latch set
3. Hook forging.
Vista de pagina 88
1 2 ... 84 85 86 87 88 89 90 91 92 93 94 ... 129 130

Comentarios a estos manuales

Sin comentarios