Rm-materials-handling WIRE ROPE HOISTS Service Manual de usuario Pagina 117

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 130
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 116
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
117/130
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
6.7.1 Outfitting the hoist
Install the power supply. Refer to the section “Connecting the to mains network”.
Adjust the limit switch for hoisting. Refer to the section “Adjusting hoisting limit switch”.
Carry out the commissioning inspection and complete the commissioning log. Refer to the section
“Commissioning”.
6.8 Installing the hoist, machinery hoist
c_hmv3b
Remove the temporary transport supports. Take the hoist out of the packing and move it to the
installation site.
Check that the fixing holes in the site of location match the fixing holes (1) in the hoist.
Change electric cubicle position if needed.
# All fixing directions A, B, C and D are possible. Move the fixing parts (2) to correct fixing corners.
Lift the hoist into position. Fasten the fixing screws.
Instal rope reeving.
! Instal rope direction(s) according to manufacturer’s instruction. Be in contact with
authorised hoist service.
6.8.1 Outfitting the hoist
Install the power supply. Refer to the section “Connecting the to mains network”.
Adjust the limit switch for hoisting. Refer to the section “Adjusting hoisting limit switch”.
Carry out the commissioning inspection and complete the commissioning log. Refer to the section