Rm-materials-handling WIRE ROPE HOISTS Service Manual de usuario Pagina 38

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 130
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 37
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
38/130
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
5.13 Hoisting limit switch Drum size φ 243 mm
The roller lever limit switch unit for hoisting is located under the drum cover, on the limit switch fixing
plate.
5.13.1 Service
Check the proper tripping point of lower limit function.
Check that the locking screws (3) are tight.
Check the wiring for loose connections.
Assembly
c_zlowli01c
2
3
4
1
1. Hoist limit switch
2. Connection box cover
3. Fixing screws for limit switch
4. Fixing nut
Disassembly:
Switch OFF the power supply to the hoist.
Remove the connection-box cover (2).
Remove the wires from the limit switch connector in the connection-box.
Remove the fixing screws (3).
Extract the limit switch (1).
Re-assembly:
Fit the limit switch carefully in its place, so that the roller lever is in correct position and in front of the
limit switch fixing plate.
Tighten the fixing screws (3)
Re-connect the wires.
Switch ON the power supply to the hoist and check the proper functioning of the limit switch.
! In many cases it is necessary to re-adjust the limit switch. Be aware of incorrect settings
during testing the operation.
Vista de pagina 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 129 130

Comentarios a estos manuales

Sin comentarios