Rm-materials-handling WIRE ROPE HOISTS Service Manual de usuario Pagina 78

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 130
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 77
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
78/130
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
13-14 25 194 65 23 M10 15
15-16 30 220 65 25 M12 18
Check that the rope clamp-nuts are tight.
Ensure that the rope has not slipped in the rope anchorage by comparing the measures with the
stated measures in the table.
Make sure the rope end protrudes from the rope anchorage as specified on table.
Check the condition of the rope at point “A”.
Ensure that the rope is assembled inside the rope anchorage correctly.
5.28.2 Assembly
5
6
7
1
4
3
2
c
_
roan01
_
d000491c
1. Rope
2. Rope anchorage
3. Wedge
4. Rope clamp
5. Split-pin
6. Washer
7. Shaft
Disassembly:
Lower the hook onto a stable platform. Pull some more rope off the drum with a gloved hand.
Switch OFF the power supply to the hoist.
Remove the split-pin (5).
Remove the washers (6) and the shaft (7) while holding the rope anchorage (2).
Slide the rope anchorage out of the overload device.
Remove the rope clamps (4).
Tap the wedge (3) out of the rope anchorage and remove the rope (1).
Vista de pagina 77
1 2 ... 73 74 75 76 77 78 79 80 81 82 83 ... 129 130

Comentarios a estos manuales

Sin comentarios