Rm-materials-handling WIRE ROPE HOISTS Service Manual de usuario Pagina 91

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 130
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 90
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
91/130
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
Hook block, all other models
c_hb20as1b_004723
Note: The actual hook block outlook may vary, depending on the size!
2. Safety latch set
3. Hook forging.
4. Hook bearing set
5. Thrust bearing
6. *) Locking ring or nut
7. Cover
8. Shaft & shaft locking screws
9. Sheave cover
10. Rope sheave
11. Side plate & side plate locking screws
12. Rope sheave bearing set
*) In bigger models the locking ring is replaced by a locking nut
**) Depending on the amount of rope falls, there are additional sheave, side plates and sheave covers
Disassembly:
Lower the hook onto a stable working-platform. Pull with a gloved hand some extra rope down from
the drum, so that the hook-block is free. If needed, adjust the lower limit switch.
Vista de pagina 90
1 2 ... 86 87 88 89 90 91 92 93 94 95 96 ... 129 130

Comentarios a estos manuales

Sin comentarios